New Listing
$3,300
 $18 est/mo Sourced by Back At You

8109 Ganttcrest Dr,Austin, TX 78749

Austin, TX 78749

Share:

Description

"Spacious 4-Bed Retreat in Austin with Granite Elegance!" Revel in the tranquility and elegance of this stunning 4-bedroom sanctuary at 8109 Ganttcrest Dr, nestled in the heart of vibrant Austin, TX. This 2,792 sq ft haven boasts exquisite granite countertops that elevate the heart of the home, providing the perfect setting for culinary adventures and memorable gatherings. With two full baths and an additional half bath, mornings flow seamlessly for everyone in the household. Each corner of this expansive residence is designed for both comfort and style, offering ample space to create cherished memories. The open floor plan is perfect for entertaining, allowing for a natural flow between living spaces. Sunlight dances through large windows, illuminating the home's elegant finishes and creating a warm, inviting atmosphere. Located in the desirable 78749 area, convenience is at your doorstep, offering easy access to local shops, dining, and outdoor activities. Enjoy the perfect blend of modern amenities and serene living, making it an idyllic choice for those seeking a harmonious lifestyle. Experience the joy of living in a place that feels like home from the moment you walk through the door.

Details

MLS #5904938
Listing TypeFor Lease
StyleHouse
StatusActive
Year1995
Days On Site1
Listing Provided ByPMI Austin | Federico Argueta

Features

Bed(s)4
Bath(s) 3 Total
SQ Feet2,732
Garage2
Story(s)2
Acreage0.19
Water FrontYes
Property ViewNeighborhood

Interior

Interior FeaturesCeiling Fan(s), Ceiling-High, Granite Counters, Double Vanity, Entrance Foyer, Multiple Dining Areas, Multiple Living Areas, Pantry, Primary Bedroom on Main, Recessed Lighting, Track Lighting, Walk-In Closet(s)
CoolingCentral Air
HeatingCentral, Natural Gas
AppliancesCooktop, Dishwasher, Disposal, Gas Cooktop, Microwave, Oven, Free-Standing Range, Self Cleaning Oven, Stainless Steel Appliance(s)
Fireplace FeaturesFamily Room, Gas Log
Fireplaces Total1
Window FeaturesWindow Coverings
FlooringTile, Wood

Exterior

Exterior FeaturesNo Exterior Steps, Private Yard
RoofComposition
Foundation DetailsSlab
Lot FeaturesBack Yard, Front Yard, Landscaped, Level, Trees-Heavy, Trees-Large (Over 40 Ft)
Patio And Porch FeaturesDeck, Rear Porch
FencingMasonry, Wood
Construction MaterialsBrick Veneer, Hardi Plank Type, Masonry – Partial
Security FeaturesSecurity System

Parking

Parking FeaturesAttached, Door-Multi, Garage Door Opener, Garage Faces Front
Garage Spaces2

Utilities

UtilitiesElectricity Available, Natural Gas Available
SewerPublic Sewer

Other

List AorAustin Board Of Realtors

Area Information

StateTX
CountyTravis
CityAustin
Zip Code78749
AreaSWW
Community NameVillage At Western Oaks Sec 11
School DistrictAustin ISD
Elementary SchoolMills
High SchoolBowie
Listing VS Median (in Village At Western Oaks Sec 11)
Price:
$3,300
low | high
Med:
$3,300
50% of Average
sqft:
2,732
low | high
Med:
2,732
50% of Average
$ / sqft:
$1
low | high
Med:
$1
50% of Average
On site:
1
low | high
Med:
1
100% of Average
Sourced by Back At You

Request a showing

Request a showing

Contact


Additional Information


Showing Information


Submit Form

Required Field
By submitting, you agree to receive promotional texts and/or calls from Coldwell Banker DAnn Harper at the number provided. Message/data rates may apply. Consent is not a condition of purchase, and you can opt out anytime by replying STOP.

 Listings courtesy of Austin Board of REALTORS® MLS as distributed by MLS GRID.

Based on information submitted to the MLS GRID as of September 10, 2026 at 12:42:10 AM PDT All data is obtained from various sources and may not have been verified by broker or MLS GRID. Supplied Open House Information is subject to change without notice. All information should be independently reviewed and verified for accuracy. Properties may or may not be listed by the office/agent presenting the information.

The Digital Millennium Copyright Act of 1998, 17 U.S.C. § 512 (the “DMCA”) provides recourse for copyright owners who believe that material appearing on the Internet infringes their rights under U.S. copyright law. If you believe in good faith that any content or material made available in connection with our website or services infringes your copyright, you (or your agent) may send us a notice requesting that the content or material be removed, or access to it blocked. Notices must be sent in writing by email to [email protected].

“The DMCA requires that your notice of alleged copyright infringement include the following information: (1) description of the copyrighted work that is the subject of claimed infringement; (2) description of the alleged infringing content and information sufficient to permit us to locate the content; (3) contact information for you, including your address, telephone number and email address; (4) a statement by you that you have a good faith belief that the content in the manner complained of is not authorized by the copyright owner, or its agent, or by the operation of any law; (5) a statement by you, signed under penalty of perjury, that the information in the notification is accurate and that you have the authority to enforce the copyrights that are claimed to be infringed; and (6) a physical or electronic signature of the copyright owner or a person authorized to act on the copyright owner’s behalf. Failure to include all of the above information may result in the delay of the processing of your complaint.

Contact

Learn More About This Property

StateTX
CountyTravis
CityAustin
Zip Code78749
AreaSWW
Community NameVillage At Western Oaks Sec 11
School DistrictAustin ISD
Elementary SchoolMills
High SchoolBowie
Listing VS Median (in Village At Western Oaks Sec 11)
Price:
$3,300
low | high
Med:
$3,300
50% of Average
sqft:
2,732
low | high
Med:
2,732
50% of Average
$ / sqft:
$1
low | high
Med:
$1
50% of Average
On site:
1
low | high
Med:
1
100% of Average
Sourced by Back At You
Nearby Listings (Within 1/2 mile)
Price: $2K - $4K
sqft: 2,000 - 3,000
Listing Updated: September 8, 2026 at 2:41:11 PM PDT
Real Estate Links Our Domains